Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


Ready for backing down the ramp into the water. The large holes have been plugged with towel covered flower pots to see how she floats with no ballast.


Return to "Ballast test"