Contact Us


Project Stages

   Getting Started
   Hull Construction
   Masting and Rigging

   Into the Water

   > Ballast Tests

   > First Sail Test

   > With Square Sails


 About the project

With some folks in the boat the bilge pump (hung over the side away from the dock) filled the ballast tank in about 11 or 12 minutes.  The folks on the dock are holding on to help Little Leon through the unstable period just before the ballast tank is full.

Return to "First Sail Test"