Contact Us


Project Stages

   Getting Started
    Hull Construction

   Masting and Rigging

   > Building the masts
   > Standing rigging
   > Making the sails

   Into the Water


 About the project

The 4 square sails are set.  The deep curve in the lower topsail (the lowest square avoids chaffing on the edge of the fore top, the wooden platform on the foremast, and the forestay that leads down from the top.   The topgallant, the second sail from the top, has a similar, though less pronounced curve, for the same reason. 

Return to "Making the Sails"