The same 27 planks at the bow. From now on we will be plank down from the keel rather than up from rail. The reason for this is that the 27 th plank was difficult to install because when the lower edge of the plank was properly fit the upper edge did not want to lie flat on the forms. This is the sign that we have to move to the keel.