Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


The tapered stealer plank has been driven up into the tapered gap. The gap was actually a little wider then one plank so an additional, very small stealer plank was made to fill this gap. The need for this means I should have installed the first stealer plank a little earlier.

Return to "Planking "