Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


Then a glue spreader, carved to fit the groove, is dragged down the length of the plank spreading the glue on the sides of the groove as well as on the two narrow top surfaces as some of the glue is forced out of the groove.

Return to "Planking "