Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project


Cordell is holding the 2000 gph bilge pump (just like a sump pump for a house) that is used to fill the ballast tank in about 10 or 12 minutes.  It is powered by a 12 volt, 52 pound battery (green in lower right corner).  The switch is the little orange box above the tiller.

Return to "Main Deck and Finishing"