The waterline is on and the entire hull, inside and out, has received 3 coats of varnish.  The epoxy coating is actually more durable than the varnish but UV rays degrade the uncoated epoxy.  The varnish absorbs the UV rays.  The hull will next be put on the trailer and covered to weather the winter outside behind the house. 