Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


The waterline is on and the entire hull, inside and out, has received 3 coats of varnish.  The epoxy coating is actually more durable than the varnish but UV rays degrade the uncoated epoxy.  The varnish absorbs the UV rays.  The hull will next be put on the trailer and covered to weather the winter outside behind the house. 


Return to "Main Deck and Finishing"