Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

Mauricio is gluing 5' strips of 1/2" by 1/2" oak together to make 18' lengths.  These will be bent and glued together to form a 2" by 1/2" rail that will go all around the hull.  The same strongback used for the forms is used to ensure that the joints are all straight.

Return to "Main Deck and Finishing"