Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The first lamination (1/4” plywood) is on both the quarter and the anchor decks. Just aft of the foremast (red arrow) is a filler plate to cover the space that permits the masts to hinge back. I had a design - and Mauricio had a better design.

Return to "Main Deck and Finishing"