Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The stem & stem head have been glued on. The mainmast is used to keep the stem head aligned properly as the glue dries. Conveniently, the bowsprit and the mainmast are the same diameter. At the heel of this ‘bowsprit’ can be seen the triple thick deck beam that will provide a secure fastening place for the actual bowsprit.

Return to "Main Deck and Finishing"