Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


These five cross pieces were installed while the frames were in place. Wedges were used to force the hull to the size of the frames. The four cross pieces midships are drawing the hull in as much as 1 ½”. The cross piece in the bow is pushing the hull out about 1”. Once the hull was in the right position all the frames were removed.


Return to "Frames"