Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The shell has been flipped over on its back so that the keel can be glued on. The keel has been precoated with three coats of epoxy which will be standard practice when adding components onto the hull. The hull now weighs 165 pounds.

Return to "Frames"