Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The clamp is in place and its legs are screwed to the strongback. The shims are used to close up any gaps between the laminations. This epoxy glue does not need firm clamping only enough pressure to maintain contact.

Return to "Frames"