Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The whole form has been tilted using 2 2x4 bolted to the strongback. This arrangement was devised by Pat’s brother, Rick. It obsoletes the little red chair for saving my back when planking. Here the tilt makes putting the keel strip on the bottom easier.

Return to "Making the Forms "