Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

With the final sanding complete, the cracks and holes need to filled with the same fairing compound used on the outside of the hull. These are the two components that when mixed together form the putty.

Return to "Fiberglass "