Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The glue is ever present on the inside as it was on the outside. The next job, in fact, is to remove the glue, fair the wood and fiberglass the inside. Behind Alice and Ariana the forms that were removed can be seen. They will eventually be cut into frames and glued back into the hull. I should also mention here that most of the construction has been performed to the angelic voice of Snatum Kaur (pictured on the 2 CDs) singing poems written by Sikh gurus.

Return to "Fiberglass "