Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

The after lower deck has been glued into place. The access hatch, with the window, is bolted into the deck. If you look closely you can see the bolts circling the edge of the access hatch - this is the first metal that is a permanent part of the boat. In the foot well, two triangular spaces are evident that need to be filled.

Return to "Decking and Finishing"