Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


Marking the depth of a side wall of the foot well. The top edge is straight but the bottom edge needs to rest on the frames. The side walls will be laminated from two thicknesses of ¼” plywood. This is done to allow the wall to curve.


Return to "Decking and Finishing"