Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


All the blocks have been installed. The lower deck will provide the seats for crew (and any passengers). To provide leg room, a central portion of the lower deck will be cut away to form a ‘foot well’. The foot well is outlined with thin strips of wood.


Return to "Decking and Finishing"