Contact Us


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing

   Masting and Rigging

   Into the Water


 About the project

Here, the carved block has been glued in place. Imperfections due to the carving are mercifully irrelevant because the epoxy product that is used for gluing is truly gap filling and as long as it makes contact with both surfaces, the bond is strong.

Return to "Decking and Finishing"