Contact Us

 Home


Project Stages

   Getting Started

   Hull Construction

   > Building the Form

   > Planking

   > Fiberglass

   > Fitting the Frames

   > Lower Deck

   > Ballast Test

   > Main Deck & Finishing


   Masting and Rigging

   Into the Water

 Credits

 About the project


Here, the carved block has been glued in place. Imperfections due to the carving are mercifully irrelevant because the epoxy product that is used for gluing is truly gap filling and as long as it makes contact with both surfaces, the bond is strong.


Return to "Decking and Finishing"