Contact Us

 Home


Project Stages

   Getting Started
   > Preparing the Shop

   > Developing the Plans
   Hull Construction
   Masting and Rigging

   Into the Water

 Credits

 About the project


  The garage is 19’ long and Little Leon’s hull is 16’ so a temporary extension is necessary to give some work room around the hull. The extension is 5’ long and fits up against the door opening.